House plans and house technical systems overview is available in PDF catalogs below
KARU TEE 3-1, VIIMSI VALD, HARJUMAA
Price: € SoldLand plot reg.nr.: 89001:001:0589
House area: 103 m2
If you value quality, innovative solutions, environment, exclusivity and comfort of life, then VIIMSI SEMI-DETACHED HOUSE is created for You.
House locates in green, quit and very safe residential area, which is well connected to the other parts of Tallinn through extensive public transport opportunities. This area offers a lot in terms of outside sport activities and at the same time is "peppered" with good cafes and restaurants for eating out or just spending some free time. The proximity of city and surroundings nature make life comfortable while providing privacy.
Our houses are examples of future homes, where complex solutions are thought out. Modern heating system combined with heat preserving materials use result in lowered utility bills for the owners.
Short description of the house
- 1 Floor
- Kitchen, living room, bathroom + wc + sauna, technical room/ storage room, 3 bedrooms and wardrobe
- Shed
- Ground floor terrace
Building structure
- Foundation – reinforced concrete + FIBO 5
- External walls - FIBO 200 mm ( fibotherm lightweight insulation blocks) + PIR Insulation IKO ENERTHERM ALU 50 Floor slabs - concrete
- Internal walls - FIBO
- Roof - flat roof with SBS roll roofing material with insulation 350 mm
- Facade - panels
- Windows: pvc with triple selective glass
- Slide wooden terrace door with tripple glazing
- Outer door - wooden door
Utility systems
- Heating: air-to-water heat pump Daikin Altherma 3 with integrated hot water heater
- House has floor heating with each room separately controlled via control panel on the wall
- Heating system boiler also heats water used for in-house consumption
- Ventilation system with heat recovery WOLF CWL-F-300
- Electricity - 3x20A, 2 tariff meter
- Centralized water supply and sewer drainage
- Fire alarm system – local smoke detectors installed; cabling works performed to ensure readiness for the connection to security company’s services
- Security alarm – cabling works performed to ensure readiness for the connection to security company’s services
- Energy use: modern heating system combined with heat preserving construction materials help to reduce utility costs
- Energy class "B"